View Single Post
  #7  
Old 03-05-2014, 04:16 PM
Gaff Gaff is offline
COTEP Member
 
Join Date: Nov 2013
Posts: 11
Thanks: 0
Thanked 7 Times in 2 Posts
Default Finished M1A Stock Modification/Customization

I thought I would update the thumbnails with the finished product. Total time was around 80 hours or so. 10 coats of hand rubbed oil finish added to the time, but the checkering took most of the labor and concentration.
Attached Images
File Type: jpg IMG_1259 small.jpg (100.2 KB, 17 views)
File Type: jpg IMG_1262 small.jpg (98.5 KB, 13 views)
__________________
Shoot Straight, And Do The Right Thing.

Gaff
Reply With Quote