Crawl Space. Full basement was out our spending range. Lots of excavation since the house sight is essentially flat.
__________________
Semper Paratus (Always Prepared) CBOB 003 |
#3
|
|||||
|
|||||
![]()
PICTURES? I (we) would love to see pictures of the home you're building as it comes along. Ohhh... the pain of building a new home! But... you will be happy when you cross the threshold and spend the first night there. Congratulations and good luck!
__________________
COTEP: CBOB578 DW CCO SIG GSR 1911 SA Micro Compact and a spectacular cast of others! "You have never lived, until you have almost died. And for those who fight for it, life has a flavor that the protected will never know." Guy de Maupassant, 1893. Anonymously, penned on a sign at a command post at Khe Sanh, RVN. |
#4
|
|||||
|
|||||
![]()
Padre-
My Pastor was there for the ground breaking. The builder and project manager are both strong Christians. We are planning a versing party once it gets weathered in. A versing party is where folks are invited to come bringing their or using our Bible to inscribe appropriate verses on the studs and framing prior to the sheet rock. Of course I will be burning hot dogs hamburgers and chicken. I'll have to refigure how to post photos on this site. Well Clearing is complete, chipping is done...the clearing contractor elected to haul some of the logs since his 700 HP diesel chipper gave him problems. An initial 4-6" of VDOT 57 rock is down on the drive way but not adequately graded to traverse in the sedan we were in today. My wife had thyroid surgery on Tuesday so she was not up to much walking or sight seeing today.
__________________
Semper Paratus (Always Prepared) CBOB 003 |
#5
|
|||||
|
|||||
![]()
Well they have finished clearing the building site, spread the chipped trees and by lunch time were 1/2 to 2/3 the way done digging the footings. Where the digging was complete they have started with the three courses of #4 rebar with Chairs and driven anchors of rod holding it positioned roughly in the middle of the pour. According to the PM they will finish digging and setting rebar this afternoon. Current plans are for the county inspector and the project manager to inspect in the AM with a concrete pour late morning or early afternoon.
The footing crew are Latinos (Mexican I think) and they spoke politely to Mrs. Paratus and I and then were back to work...only paying enough attention to us to make sure we were out of the swing arc of the excavator. Hard working dudes. The 10-12000# Kubota excavator had a 24" wide 6-8 cubic foot bucket on it and every 20 seconds or so here came another scoop of dirt. I had helped hand digging some footers in the past...Shovels, pick maddoxs, wheel barrows, optical transits and witness sticks...heck of a lot better with this crew. Especially since I was not on the dumb end of a shovel.
__________________
Semper Paratus (Always Prepared) CBOB 003 |
#7
|
|||||
|
|||||
![]() Quote:
So, the main framing will be Block & Stucco, as opposed to all Wood with that special sheeting (I forget what it's called)? |
#8
|
|||||
|
|||||
![]()
tyvek??
__________________
COTEP: CBOB578 DW CCO SIG GSR 1911 SA Micro Compact and a spectacular cast of others! "You have never lived, until you have almost died. And for those who fight for it, life has a flavor that the protected will never know." Guy de Maupassant, 1893. Anonymously, penned on a sign at a command post at Khe Sanh, RVN. |